Loan Types
FHA Multifamily Loan Guide — HUD 223(f), 221(d)(4), 223(a)(7) and 241(a)
FHA multifamily loan and HUD multifamily loans compared: 223(f), 221(d)(4), 223(a)(7) and 241(a) terms, 87% leverage, non-recourse structure, fees, timelines and who each fits.
Send your 5+ unit deal
Five quick fields (phone optional). A multifamily specialist replies with a lender-fit read the same business day. No credit pull.
US 5+ unit multifamily only. We match deals to lenders; this site does not originate loans.
By Multi-Family USA Editorial Team · Reviewed by Josh Bauerle · Published · Updated · 11 min read
What is an FHA multifamily loan?
An FHA multifamily loan is a mortgage on a rental property with five or more units that carries FHA mortgage insurance. HUD's menu includes 223(f) for existing buildings, 221(d)(4) for construction or substantial rehab, 223(a)(7) for streamlined refinancing and 241(a) for supplemental loans. Typical leverage runs 85-87% with a target hold of 10-40 years.
FHA multifamily loans at a glance
When borrowers search for an FHA multifamily loan, FHA multi family loan, or HUD multifamily loans, they are looking at one family of programs: loans on apartment buildings with five or more units that carry mortgage insurance from the Federal Housing Administration (FHA), part of HUD. The insurance protects the lender, which is why HUD-insured loans can offer leverage, amortization and non-recourse terms that private lenders rarely match. They are commercial multifamily programs, not the FHA home loans used for one-to-four-unit houses. For live coupon context (before MIP), see current multifamily loan rates. For lender names, see best HUD/FHA multifamily lenders.
Four programs matter for most sponsors, and they solve different problems:
| 223(f) | 221(d)(4) | 223(a)(7) | 241(a) | |
|---|---|---|---|---|
| Use | Buy or refinance an existing, stabilized building | New construction or substantial rehab | Streamlined refinance of a loan HUD already insures | Supplemental second loan for repairs or additions |
| Minimum size | 5+ units | 5+ units | Existing insured loan | Existing insured first mortgage |
| Max leverage (market rate) | 87% LTV | 87% of cost | Lesser of original balance, debt plus costs, or 90% of NOI | Owner equity of at least 10% of total cost; sized with the first mortgage |
| Min DSCR (market rate) | 1.15x | 1.15x | No re-sizing to DSCR; NOI test | Per underlying program |
| Max term | 35 years | 40 years | Up to 12 years beyond existing maturity | Generally matches first mortgage |
| Recourse | Non-recourse | Non-recourse | Non-recourse | Non-recourse |
| Prepayment | 5-year statutory restriction; lenders typically add a declining schedule | Negotiated with lender | Prepayment of the old loan needs HUD approval | Negotiated |
| Davis-Bacon wages | Not applicable | Applies | Not applicable | Not applicable if first mortgage is 223(f) or 223(a)(7) |
| Typical timeline | Roughly 5-6 months | Longer (pre-application, construction review) | Varies | Varies |
Figures are from HUD Mortgagee Letter 2025-03, the MAP Guide and HUD’s multifamily program descriptions. Terms vary by lender, property type and deal, so confirm any number with a HUD-approved MAP lender before you rely on it.
Multi-Family USA is an independent matching service, not a lender. It cannot issue a HUD commitment. What it can do is explain the programs and route your deal to lenders that work in the space.
Section 223(f): buy or refinance an existing building
HUD describes Section 223(f) as insuring loans for the purchase or refinancing of existing multifamily rental housing, including properties first financed conventionally. It is the program most owners of stabilized apartments mean when they ask about “HUD financing.”
What qualifies
- At least five residential units with complete kitchens and baths.
- A certificate of occupancy at least three years old. The MAP Guide says these properties must document stable occupancy of at least 85% and stable operating results. Newer buildings can qualify, but they must hit the program DSCR for three consecutive months and meet extra lease-up documentation tests.
- No substantial rehabilitation. HUD requires critical life-safety repairs before endorsement and allows non-critical repairs afterward. HUD’s program description caps the work at one major building system, and one MAP lender’s guidelines describe moderate rehab of up to $15,000 per unit, adjusted for high-cost areas.
How it is sized. Under the MAP Guide, the maximum loan is the lesser of the requested amount, the statutory limit, the amount the DSCR supports and the amount the loan-to-value ratio supports. Since January 8, 2025, Mortgagee Letter 2025-03 sets the following for applications that had not yet reached initial endorsement:
| Property category | LTV / LTC | DSCR |
|---|---|---|
| Market rate (or LIHTC without a rent advantage) | 87% (was 85%) | 1.15 (was 1.176) |
| Affordable (LIHTC with a rent advantage to market) | 90% (was 87%) | 1.11 (was 1.15) |
| 90%+ units with rental assistance | 90% | 1.11 |
HUD applies a vacancy factor of 7% for market-rate deals and 5% for affordable deals, and the letter notes no change to the 223(f) cash-out test. The MAP Guide limits cash-out refinances to the greater of 80% LTV or the cost to refinance, and requires that half of cash-out proceeds be held in escrow when repairs are deferred. Very large loans have separate, tighter sizing. The MAP Guide shows a table for loans of $75 million and above, while one lender’s 2025 sheet cites $130 million, so ask your lender which applies.
Term and prepayment. The loan term cannot exceed 35 years or 75% of the property’s remaining economic life, whichever is less. The National Housing Act restricts prepayment for five years from endorsement, and MAP lenders typically layer a negotiated schedule on top. One MAP lender describes ten years of call protection on a declining 10-to-1 schedule followed by open prepayment. Model your exit before you accept any schedule. Our yield maintenance calculator helps with fixed-rate products that use that mechanism, though HUD’s declining schedule works differently.
Section 221(d)(4): new construction and substantial rehab
Section 221(d)(4) insures loans for the new construction or substantial rehabilitation of multifamily rental or cooperative housing with five or more units. The MAP Guide allows HUD to insure both the construction and the permanent loan periods. That is the draw: one loan with a fixed rate and a single closing instead of a construction loan followed by a takeout.
- Leverage and DSCR. Market-rate projects are sized to 87% of replacement cost at a 1.15 DSCR after Mortgagee Letter 2025-03, down from 85% and 1.176.
- Term. Up to 40 years for new construction or substantial rehab, per the MAP Guide.
- Davis-Bacon. The MAP Guide says prevailing wages and certified payroll apply to the general contractor and subcontractors on 221(d)(4) work. Budget for it.
- Process. Under MAP the lender submits a pre-application. HUD either invites a firm commitment application or declines to consider the deal further. The firm commitment review then weighs market need, zoning, architecture and the sponsor’s capability.
- Cost certification and reserves. Expect an operating deficit reserve, cost certification and HUD inspection throughout construction.
A dedicated page covers the program in depth: HUD 221(d)(4) construction loans. For the existing-building counterpart, see HUD 223(f) loans.
Section 223(a)(7): refinance an existing HUD loan
If your property already carries a HUD-insured loan, 223(a)(7) is a streamlined way to refinance. The MAP Guide says only currently FHA-insured loans are eligible. Most transactions lower the interest rate and re-amortize, either within the remaining term or with an extension of up to 12 years, always capped at 75% of the property’s remaining economic life.
Sizing is simple: the lesser of the original principal balance, the existing debt plus transaction costs, or the amount supported by 90% of NOI. A capital needs assessment is required, and properties needing substantial repairs or new construction are not eligible. The application fee is lower than for 223(f), at $1.50 per $1,000 of the requested amount under MAP, and the upfront insurance premium is listed at 0.5%.
The trade-off: 223(a)(7) is built to cut debt service, not to pull out cash. If you want equity out of a HUD-insured property, a new 223(f) is usually the route.
Section 241(a): supplemental financing
A 241(a) loan sits behind an existing HUD-insured first mortgage and pays for repairs, alterations, additions or substantial rehab. The MAP Guide requires the owner to contribute at least 10% of total development cost, allows new units up to the number in the existing building, and expects a cross-default so that a default on the first mortgage triggers a default on the 241(a) loan, but not the reverse. Davis-Bacon does not apply when the first mortgage is a 223(f) or 223(a)(7) loan.
Terms table: HUD versus agency
| HUD 223(f) | HUD 221(d)(4) | Freddie Mac conventional fixed-rate | |
|---|---|---|---|
| Loan size | Statutory per-unit limits; lender floors apply | Statutory per-unit limits; lender floors apply | $10 million minimum |
| Leverage | 87% LTV market rate | 87% of cost market rate | Up to 80% LTV |
| DSCR | 1.15x | 1.15x | 1.25x minimum |
| Amortization | Fully amortizing, up to 35 years | Fully amortizing, up to 40 years | Up to 30 years |
| Term | Up to 35 years, fixed | Up to 40 years, fixed | 5-10 years (up to 30 if not securitized) |
| Recourse | Non-recourse with bad-act carve-outs | Non-recourse with bad-act carve-outs | Non-recourse with standard carve-outs |
| Prepayment | 5-year statutory restriction plus negotiated schedule | Negotiated | Yield maintenance, then lockout and defeasance |
| Key fees | HUD exam fee $3 per $1,000, MIP, inspection fee | Same plus construction-period costs | Application fee: greater of $2,000 or 0.1% |
| Timeline | About 5-6 months | Longer | Typically shorter |
Freddie Mac figures come from its Optigo fixed-rate term sheet; HUD figures from the sources above. Agency lenders also operate within annual volume limits. FHFA set 2026 caps of $88 billion each for Fannie Mae and Freddie Mac, with workforce housing excluded.
For more on the other path, see agency stabilized financing and the FHA vs agency comparison.
Worked example (hypothetical)
This is an illustration with round numbers, not a quote. Suppose a sponsor wants to refinance a stabilized 120-unit market-rate apartment community that is five years past its certificate of occupancy.
- Appraised value: $16,000,000
- NOI as HUD underwrites it: $1,200,000
- Illustrative all-in rate including insurance premium: 6.25%, 35-year amortization (annual constant of about 7.04%)
Step 1, leverage test. 87% of $16,000,000 is $13,920,000.
Step 2, DSCR test. At a 1.15 DSCR, maximum debt service is $1,200,000 / 1.15, about $1,043,000. Dividing by the 7.04% constant gives a loan of about $14.8 million.
Step 3, take the lesser. The 87% leverage test controls, so the indicative loan is about $13.9 million, with annual debt service near $981,000 and an actual DSCR of about 1.22x. HUD’s statutory per-unit limit could still reduce the number, and a lender may haircut NOI.
For comparison, 80% of the same value is $12.8 million, about $1.1 million less. That extra proceeds figure is the case for HUD. The price is time, the premium and compliance. Test your own numbers in the loan sizing calculator, the commercial DSCR calculator, the debt yield calculator and the cap rate and NOI calculator. The multifamily mortgage calculator shows payments, and the closing cost calculator helps you budget the fees.
Who it fits, and who it doesn’t
HUD financing fits when:
- You plan to hold for many years and want the longest fixed-rate amortization available.
- You need the highest leverage on a stabilized building, or you want a refinance that outlasts a typical 10-year agency term.
- You are building or doing a gut rehab with patient equity, and want construction and permanent debt in one loan.
- Non-recourse structure matters to you. HUD notes are non-recourse to the borrowing entity, with bad-act carve-outs.
- Your property is affordable or rent-assisted, where HUD allows up to 90% leverage at a 1.11 DSCR.
It usually does not fit when:
- You need to close in 30 to 45 days. HUD review takes months.
- You plan to sell or refinance within five years. The prepayment restrictions make early exits costly.
- The property has under 85% stable occupancy, or needs more than light-to-moderate repairs, in which case a bridge loan is the realistic first step. See bridge value-add.
- The loan is below the size where HUD fees and legal costs are worth it. Many lenders set their own floors, so ask.
- The building has fewer than five units (a standalone duplex or fourplex still does not qualify; a five-plus-unit build-to-rent community can, under Mortgagee Letter 2026-12).
How the HUD process works
Most HUD multifamily loans run through Multifamily Accelerated Processing (MAP). A MAP-approved lender does the underwriting and submits a firm commitment application to HUD, whose reviewers decide whether the loan is an acceptable risk. Lenders that are not MAP-approved must use HUD’s slower Traditional Application Processing. In practice: pick a MAP lender, assemble the package (operating history, rent roll, third-party reports), submit, wait for the firm commitment, then close at initial endorsement. Third-party reports typically include an appraisal, a capital needs assessment, an environmental report and zoning and radon work. For stage-by-stage detail, read our FHA and HUD multifamily financing process guide.
Questions to ask before you commit
- Which program fits the property today: 223(f), 221(d)(4), 223(a)(7) or 241(a)?
- What is the lender’s own minimum loan size, and what fees apply beyond HUD’s?
- What is the all-in cost, including mortgage insurance premium, once you compare it against agency debt?
- What does the prepayment schedule look like in years 1 through 10?
- What is the written timeline, and what happens if rates move before the rate lock?
Check current pricing context on the rates page. If you want a second opinion on structure, send your numbers through deal review.
Related loan programs
Compare this with Freddie Mac Optigo loans, which cover other financing routes for 5+ unit buildings.
Sources
- HUD Mortgagee Letter 2025-03, January 8, 2025: DSCR and LTV/LTC changes.
- HUD Mortgagee Letter 2026-12: build-to-rent eligibility under 221(d)(4) (new construction) and 223(f) (certificate of occupancy less than three years before application).
- HUD MAP Guide, revision of March 19, 2021: loan terms, fees, prepayment, non-recourse, 223(a)(7) and 241(a) rules. Where it conflicts with Mortgagee Letter 2025-03, the letter controls.
- HUD multifamily program descriptions: program purposes, unit minimums and term limits.
- Freddie Mac Optigo fixed-rate term sheet, April 2026.
- FHFA 2026 multifamily loan purchase caps, November 24, 2025.
- Draper and Kramer 223(f) program guidelines: one MAP lender’s published timeline and prepayment structure, shown as an example of market practice.
This content is educational and should be combined with transaction-specific advice from financing, legal, tax and accounting professionals.
Compare agency, bridge, bank, CMBS, and FHA with a specialist and get a lender-fit read.